An urgent cargo shipment for the BKE project was sent via a challenging summer route rather than the traditional winter route, from Usinsk to the Myadsey field.
The transportation will proceed along the Pechora River and the Barents Sea, followed by a shallow-draft tug navigating the coastal river system from the Khaipudyr Bay, delivering the necessary cargo in small batches directly to the drilling site.